Detroit News Building


Client Bedrock
Location Detroit, Michigan
Size 400,000 sf
Sector Commercial
Services Architecture, Engineering, Consulting, Restoration, Interior Design
Completion 2017
Facade of a historic government or municipal building with an American flag on top, large arched windows, and a street view in an urban setting.

Detroit, Michigan | Adaptive Reuse and Historic Renovation

Albert Kahn designed the Detroit News Building at 615 W. Lafayette Boulevard in downtown Detroit, and the building opened in 1917 as home to the Detroit News. One hundred years later, Albert Kahn Associates returned to lead the building's renovation and restoration, adapting the former newspaper headquarters for new owners and a new generation of collaborative workers.

History

The Detroit News occupied the building from its opening in 1917 until 2014. At the time of its completion, it was believed to be the largest newspaper plant in the world.

The building's exterior features four statues honoring figures who shaped the printing industry: Johannes Gutenberg, William Caxton, Christophe Plantin, and Benjamin Franklin. Panels between the statues carry a message for all who enter or pass by, that the news exists for the people, "a light shining into all dark places."

Original Building Layout

The first floor originally held shipping and storage areas along with the plant's pressroom, where numerous printing presses printed, cut, folded, and counted the newspapers, visible to the public through large windows. On the floors above, hundreds of employees wrote, set, and edited the paper each day. The fifth floor originally featured a long roof monitor that brought in natural light, later removed when a sixth floor was added.

Renovation and Restoration

As the media industry changed, the building underwent alterations that hid or destroyed many original architectural details. Kahn's renovation brought many of those details back to the forefront. New ornamental elements replicate the original barrel vaults and period ornamentation as closely as possible. A new data center now occupies the space once used for printing presses. The exterior façade was restored and the building was brought up to modern code. Open workspaces were designed for new tenants, and building systems were redesigned to meet current occupant needs while delivering significant operational savings.

Detroit News Building FAQ’s

Learn more about our work in this market: Commercial

Learn more about our services: Architecture, Consulting, and Engineering